U-boot, U boat hall, Hannover, yellow, Olaf Mahlstedt

U Boat Hall

Detail

TYPOLOGY: Retail
COUNTRY: Germany
CITY: Hannover
YEAR: 2012
CLIENT: RS Möbelhandelsgesellschaft mbH
PHOTOS: © Olaf Mahlstedt

LOCKED IN SERVITUDE THE DRAMA OF A BUILDING’S MAKING REMAINS HIDDEN: (Louis Kahn)

There is today an enormous potential in the re-scripting of grand industrial spaces, survivors from an epoch that had less trouble expressing itself and its mechanical or technical potency than our current mean and exploitative ‘global shopping-centre-culture’.

One thinks of São Paulo’s Fábrica da Pompéia by Lina Bo Bardi, London’s Tate Bankside, or the Zollverein Coal Mine in Essen, Germany.

This was our first reaction as our client drove his black Porsche into the rusting cathedral of Hannover’s ‘U-boat Hall’. Was it a panic reaction at the end of WW II to build a submarine production space so far from the North Sea? The structure of the hall had in fact been originally designed for a U-boat production site of a naval dockyard in Wilhelmshaven. As it turned out the enigmatically named ‘U-boat Hall’ was only finished in 1944 and was thus not used for armament production.

Now sliced like salami the ‘Industrial Heritage Structure’ is to house various commercial outlets – a mega Bicycle Emporium where racing bikes can be tested in the shop or this landscape of coloured furniture.

This is in fact two shops; RS (wholesome wood) and Yellow (sub-designer). BOLLES+WILSON have already realized their flagship store in Münster and the HQ Building, a rooftop lake above a ‘big box’ two-floor warehouse/distribution centre.

For the ‘U-boat Hall’ the rent was based on the square meters of the hall’s floor. The architectural question was how to maximize this floor area with a selling landscape and a back of house warehouse for customers to pick up their new sofa / table / lamp.

The magnificent scale of rusting columns, elevated crane track and skylight box, resist the invasion of domestic equipment, relegating it to the status of ‘a carpet of coloured pixels’ spread across the selling decks.

U-boot, U boat hall, Hannover, yellow, Olaf Mahlstedt
U-boot, U boat hall, Hannover, yellow, Olaf Mahlstedt
U-boot, U boat hall, Hannover, yellow, modell
U-boot, U boat hall, Hannover, yellow, Olaf Mahlstedt
U-boot, U boat hall, Hannover, yellow, Olaf Mahlstedt
U-boot, U boat hall, Hannover, yellow, Olaf Mahlstedt
U-boot, U boat hall, Hannover, yellow, Olaf Mahlstedt
Raakspoort, Raaks, Haarlem, the Netherlands, Christian Richters

Raakspoort

Detail

Raakspoort – City Hall and Bioscoop

TYPOLOGY: Office / Leisure

COUNTRY: The Netherlands

CITY: Haarlem

YEAR: 2011

GFA: 18.500 sqm

CLIENT: MAB Development Nederland B.V.

AWARDS: NRW Jaarprijs, Best Retail Development, NL, 2013

Brick Award, Worldwide Brick, GB, 2012

PHOTOS: © Christian Richters

Transformative processes, particularly those relating to delicate fine-grained historic cities like Haarlem are complex and protracted. In the case of the Raaks project it took more than ten years to evolve from the considered Urban Masterplan (Donald Lambert – Kraaijvanger Urbis) through a sequence of workshops and program rethinks to the final ensemble, which opened in October 2011.

At the outset BOLLES+WILSON were given responsibility for the outermost block of this close packed, highly urban redevelopment precinct – which as it turns out (and as the masterplan prescribed) intertwines almost seamlessly with the adjacent small-scale urban fabric – a neighbourhood. The edge block must both shield (traffic) and invite (pedestrians), it must signal and respectfully take its place in the sequence of facades that define the historic limit of the medieval city. Initiating site workshops brought together neighbourhood representatives, city representatives, developers and architects – BOLLES+WILSON, Claus en Kaan, Jo Crepain and Kraaijvanger Urbis (who also had responsibility for the large format carpark below).

The complex functional mix began with one large and seven smaller Cinemas on the upper levels, a subterranean Casino and below that a parking deck (for croupiers and gamblers). Even at this stage the two functions were divided by a bisecting passage leading from the visible and representative outside facade to the networked block interior. The question of scale and historic referencing of the windowless

Raakspoort, Raaks, Haarlem, the Netherlands, Christian Richters
Raakspoort, Raaks, Haarlem, the Netherlands, Christian Richters
Raakspoort, Raaks, Haarlem, the Netherlands, Christian Richters
Raakspoort, Raaks, Haarlem, the Netherlands, Ansicht, elevation
Raakspoort, Raaks, Haarlem, the Netherlands, Christian Richters
Raakspoort, Raaks, Haarlem, the Netherlands, Christian Richters
Raakspoort, Raaks, Haarlem, the Netherlands, Christian Richters
Raakspoort, Raaks, Haarlem, the Netherlands, Christian Richters
Raakspoort, Raaks, Haarlem, the Netherlands, Christian Richters
Raakspoort, Raaks, Haarlem, the Netherlands, Christian Richters
Raakspoort, Raaks, Haarlem, the Netherlands, Christian Richters
Raakspoort, Raaks, Haarlem, the Netherlands, Christian Richters
Raakspoort, Raaks, Haarlem, the Netherlands, Lageplan, site plan
Raakspoort, Raaks, Haarlem, the Netherlands, Grundriss, ground floor
City Library_Stadtbuecherei_Helmond_Photo_Foto_Christian Richters

City Library Helmond

Detail

TYPOLOGY: Cultural

COUNTRY: The Netherlands

CITY: Helmond

YEAR: 2010

COMPETITION: 2006, First Prize

GFA: 5.630 sqm

CKIENT: City of Helmond

COLLABORATOR: Vrencken Hoen Architecten

AWARD: Fritz Hoeger Preis 2014, Winner Special Mention

PHOTOS: © Christian Richters

Like most Dutch cities Helmond is busy reinventing itself. The new City Library, which officially opens in October 2010, is the first component of a comprehensive new inner city shopping zone (masterplan: Prof. Joan Busquets). Directly adjacent to the new library are the 1970’s Tree Houses and Theatre by Piet Blom. Here the new library facade is moulded and sloped in dialogue with its dramatic neighbour. A between space, a block internal café terrace, a comfortable and dramatic extension of the existing enclosed Theatre Square is the result of this spatial symbiosis.
The outer, street-facing facade is the representative face and entrance of the new library. Upper level projections mark the extremities, brackets (ears) carrying large-format ‘Bibliotheek’ letters. A horizontal facade articulation differentiates ground level shops from glazed and setback first floor (Children’s Library) and the brick surface of the upper office level.

A careful detailing and material choice for external surfaces provides a ‘tactility’ fitting to the historic Helmond city centre. Rough dark brown and unusually horizontal bricks (Hilversum format 50 x 290 mm) on upper levels have open vertical joints and a beige horizontal mortar joint, stressing the layered grain of the brickwork. In contrast the base is in a flat beige brick (in 3 different heights – 50, 100, 140 mm). These are not laid in mortar, but glued together – resulting in a stone-like solidity and homogeneity.

The internal spaces of the library are developed as an unfolding spatial sequence. Much of the ground floor is given over to retail. Entry is from both sides – via a generous double height entrance hall to the street side and via the more intimate café and event corner facing the Theatre Court. The upward sequence is announced by a grand stair, which arrives at a first floor exhibition deck and the ‘piano nobile’ of the library. Here information stations, bookshelves and children / teenager zones are arranged around a central media Hot Spot: precisely circular, a Chinese-red sandwich. The Hot Spot offers the digital latest. The route continues upward concluding in the light-filled upper level with a long working bench integrated in the long ‘tree house-facing’ window.

BOLLES+WILSON’s commission also included furniture and lighting elements, the choreographing of atmosphere and character. Lanterns in the foyer, a newspaper reading table, a striped and upholstered café bench seat with Scandinavian lighting, information counters and a group study room with fragments of a 1950’s mural mounted on the wall, are among the long list of localised detail. The philosophy is one of multiplicity, a user-friendly comfort already much appreciated by librarians and reading Helmonders.

City Library_Stadtbuecherei_Helmond_Photo_Foto_Christian Richters
City Library_Stadtbuecherei_Helmond_Photo_Foto_Christian Richters
City Library_Stadtbuecherei_Helmond_Photo_Foto_Christian Richters
City Library_Stadtbuecherei_Helmond_Photo_Foto_Christian Richters
City Library_Stadtbuecherei_Helmond_Photo_Foto_Christian Richters
City Library_Stadtbuecherei_Helmond_Photo_Foto_Christian Richters
City Library_Stadtbuecherei_Helmond_Photo_Foto_Christian Richters
City Library_Stadtbuecherei_Helmond_Photo_Foto_Christian Richters
City Library_Stadtbuecherei_Helmond_Photo_Foto
City Library_Stadtbuecherei_Helmond_Photo_Foto_Christian Richters
City Library_Stadtbuecherei_Helmond_Photo_Foto_Christian Richters
City Library_Stadtbuecherei_Helmond_Photo_Foto
City Library_Stadtbuecherei_Helmond_Photo_Foto_Christian Richters
City Library_Stadtbuecherei_Helmond_Sketch_Skizze
City Library_Stadtbuecherei_Helmond_Siteplan_Lageplan
City Library_Stadtbuecherei_Helmond_Section_Schnitt
City Library_Stadtbuecherei_Helmond_Plan_Grundriss
City Library_Stadtbuecherei_Helmond_Plan_Lageplan
City Library_Stadtbuecherei_Helmond_Plan_Grundriss
City Library_Stadtbuecherei_Helmond_Lamps_Lampen
City Library_Stadtbuecherei_Helmond_Sketch_Skizze
cologne-muelheim harbour district_koeln-muelheimer hafen_cologne_koeln

Cologne-Muelheim Harbour District

Detail

TYPOLOGY Masterplan

COUNTRY: Germany

CITY: Cologne

YEAR: 2013 – (2015)

COMPETITION: 2013, dialogic planning process
‘Werkstattverfahren Mülheim Süd Inkl. Hafen’

CLIENT: Stadt Köln

After a dialogic planning process in 2013, the two competing planning teams around kister scheithauser gross (Cologne) and BOLLES+WILSON have teamed up for the next planning stage. The development of Mülheim’s harbour district is still an on-going process integrating various interests and disciplines. The masterplan for this 52 ha harbour area preserves various grand industrial spaces to create a new district with a unique character and atmosphere.

cologne-muelheim harbour district_koeln-muelheimer hafen_cologne_koeln_aerial view_luftbild
cologne-muelheim harbour district_koeln-muelheimer hafen_cologne_koeln_plan_schwarzplan
cologne-muelheim harbour district_koeln-muelheimer hafen_cologne_koeln_sketch
cologne-muelheim harbour district_koeln-muelheimer hafen_cologne_koeln_sketch
cologne-muelheim harbour district_koeln-muelheimer hafen_cologne_koeln_sketch
cologne-muelheim harbour district_koeln-muelheimer hafen_cologne_koeln_sketch
cologne-muelheim harbour district_koeln-muelheimer hafen_cologne_koeln_sketch
cologne-muelheim harbour district_koeln-muelheimer hafen_cologne_koeln
cologne-muelheim harbour district_koeln-muelheimer hafen_cologne_koeln
cologne-muelheim harbour district_koeln-muelheimer hafen_cologne_koeln_masterplan
cologne-muelheim harbour district_koeln-muelheimer hafen_cologne_koeln
st Sebastian_munster_markus hauschild_indoor play area

St. Sebastian

Detail

TYPOLOGY: Educational
COUNTRY: Germany
CITY Münster
YEAR: 2013
COMPETITION: 2009, 1st Prize
PHOTOS: © Markus Hauschild, Christian Richters
HISTORICAL PHOTO: © S. Ahlbrand-Dornseif, R.Wakonigg

A church becomes a kindergarten.
Not heritage listed, already condemned, the St. Sebastian church built in 1962 and deconsecrated in 2008 has been revitalized with the most lively and positive function, i.e. with children.
The elegant elliptical form of the nave physically anchors its surrounding neighborhood. Two levels of kindergarten group rooms are housed within, the roofs of these become an all-weather play deck. Grass green impact-protection flooring and street lights give the play decks the ambience of an outdoor space.
A grid of 50 x 50 cm unglazed openings, the only originally glazed light source in the church, provide constant, natural ventilation. Cold in winter, comfortably temperate in summer, but always dry, this magical inside/outside space is flooded with light.
Adjacent to the kindergarten nave, a new street facing extension houses the main entrance, kitchen, offices, technical rooms and one multipurpose room. This is available for neighborhood events.

st sebastian_munster_christian richters_facade
View across the outdoor area
st Sebastian_munster_drawing
Idea Sketch
st sebastian_munster_model
Model
st sebastian_munster_markus Hauschild_interior
Indoor play decks
st sebastian_munster_markus hauschild_interior
st sebastian_munster_markus hauschild_interior
st sebastian_munster_markus hauschild_interior
st sebastian_munster_markus hauschild_interior
st sebastian_munster_markus hauschild_exterior
Annex in the East
st sebastian_munster_markus Hauschild_interior
st sebastian_munster_christian richters_interior
Interior
st sebastian_munster_siteplan
Siteplan
st sebastian_munster_elevation
East elevation with main entrance
st sebastian_munster_elevation
South elevation
st sebastian_munster_plans
Plans
st Sebastian_munster_ahlbrand-dornseiff_wakonigg_historical
Historical image of the church
st Sebastian_munster_construction
Construction
st Sebastian_munster_construction