TYPOLOGY: Residential
COUNTRY: Albania
CITY: Korça
YEAR: 2021
CLIENT: Bregu Group
PHOTOS: © Roman Mensing
The original BOLLES+WILSON 2016 Masterplan for the center of Korça identified the Ligor Rembeci Quarter as a zone for careful insertion of new buildings in symbiosis with existing stone villas – this strategy – activating a block interior accessed by a network of passages – is now emerging with the recently completed Serenity Villas.
TYPOLOGY: Competition / Office
COUNTRY: German
CITY: Münster
YEAR: 2020
COMPETITION: Close competition, 3rd Prize
GFA: 12.740 sqm
CLIENT: Ärzteversorgung Westfalen-Lippe
Both the property side facing the city port and the street side to “Am Mittelhafen” require representative façades. Therefor a building in the north-south axis is required, which fills the property over the entire length. The two narrow views speak a suitably dignified language – to the waterfront through an invigorating silhouette that adds a building with personality to the row of existing office buildings. The opposite side facing the street is emphasized by an expressive façade – in contrast to the buildings in the immediate vicinity, which do not have such a concise address. This gives the quarter a much needed “urban flair”.
TYPOLOGY: Competition / Area development / Masterplan
COUNTRY: Italy
CITY: Naples
YEAR: 2020
COMPETITION: Closed competition
COLLABORATORS: OTTAVIANI ASSOCIATI, GREENCURE landscape & healing gardens, Gianluca Peluffo&Partners Architettura srl, Nicola Gallinaro
The proposal is based on two complementary strategic choices: the interpretation of the park as a green flow, made up of a great variety of landscapes within which there are clearings that welcome the various episodes of industrial archeology, and the redesign of the seafront in continuity up to the island of Nisida, making it possible to expand the space for the beach and the Porto Turistico.
TYPOLOGY: Educational
COUNTRY: Germany
CITY: Frankfurt
YEAR: 2022
CLIENT: City of Frankfurt
PHOTOS: © Roman Mensing
The latest BOLLES+WILSON kindergarten is now, after a protracted incubation open for its 60 mini-customers.
It is beside a fire station and behind suburban villas in Frankfurt’s Bergen Enkheim district.
The `coat of many colours´ façade is wood, sustainable, a signal for the building’s `passive house´ status. Colourful sun awnings animate the south façade where the six group rooms open to the playground or to the first floor balcony (where stairs connect down to playground). Sliding white sunscreens on the East and West façades also give night time security for open windows.
The flat roof is planted for rainwater retention and for insect habitat.
The compact volume and upper level multi purpose room are consequence of the limited site and a ground level change 2,20m.
The interior circulation gallery is animated by an optimistic green/yellow wall with giant foot/hand prints. A thematicising of scale is endemic to a building whose customers are only 90 centimeters tall.
TYPOLOGY: Competition / Office
COUNTRY: Germany
CITY: Potsdam
YEAR: 2022
COMPETITION: Closed two-phase competition, 1st Prize
GFA: 23.000 sqm
CLIENT: District of Potsdam-Mittelmark
COLLABORATORS: Lindschulte+GGL Ingenieurgesellschaft mbH, Gerhardt Landschaft, Nees Ingenieure GmbH
The structural design for the administration building on the site of the historic Beelitz sanatorium was based on the winning design by B+W for the previous urban planning competition.
By following the course of the original footpaths, the new building blends gently into the park landscape. The restored circular hiking trail in the historic park serves as a “natural” construction limit and forms the connection to the listed building.
The south side of the new building develops parallel to the street and mediates between the alignments of the different existing buildings and the traffic routes.
Public and semi-public functions such as the entrance hall, conference center, advice center and canteen are lined up in the base. The three upper floors form the main building that is visible from afar and house the office and administration area. Towards the park, like the base, it leans against the circle of the historic circular path, while towards the street sides the volume is structured into individual sections by a wave shape.